Compositio cost is partium stampionis generale in sequentibus partes divisa est: 1 Materiale costa 2 Partes standard costi 3 Processis fermentum 4 Packaging fee 5 Transportation fee 6. Management fee 7 profitum
Let's take a closer look at the composition of these expenses below
Analysis of cost composition of stamping parts
1 , Material Costa
Material cost refers to the net material cost according to the drawing requirements=material volume * material density * material unit price.
CategoryName
Componente standard a drawinge desiderata est.
3,Process processing fee
Procedentia cost a pro singulis processionis in produktum necessa est. The composition of each process is detailed in the Cost Accounting Format and the Cost Composition Table for Each Process. Hic sunt principes exercitus componentibus explicationis:
1. CNC material dropping
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for a device worth 2 million yuan, the hourly equipment depreciation is 200 * 10000/5/12/22/8=189.4 yuan/hour
Labor costa:
Each CNC requires 3 technicians to operate, and the average monthly salary for each technician is 1800 yuan. They work 22 days in month and 8 hours a day, which means the hourly cost is 1800 * 3/22/8=31 yuan/hour
Materiale auxiliaria costa:
Refers to auxiliary production materials such as lubricants and volatile liquids required for equipment operation. Each equipment costs approximately 1000 yuan per month, calculated based on 22 days per month and 8 hours per day. The hourly cost is 1000/22/8=5.68 yuan/hour
2. Bending
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for equipment worth 500000 yuan, the depreciation per minute is 50 * 10000/5/12/22/8/60=0.79 yuan/minute
Usually takes 10 to 100 seconds to make a bend, so the depression of each bending equipment is 0.13-1.3 yuan per bend.
Labor costa:
Each device requires one technician to operate, with an average monthly salary of 1800 yuan. Each technician works 22 days in month and 8 hours in day, which means the cost per minute is 1800/22/8/60=0.17 yuan/minute. On average, 1-2 bends can be made per minute. Therefore, the labor cost per bend is 0.08-0.17 yuan/track
Materiale auxiliaria costa:
Costa materiarum auxiliarum per mensem pro singula machina bending est 600 yuan. Base sunt 22 dies per mensem et 8 horas per dies, costa horatis 600/22/8/60=0.06 yuan/track
3. Surface treatment
Outsourced based on purchase price (such as electroplating, oxidation)
Compositio emissionis:
Spray coating cost=powder material cost+labor cost+auxiliary material cost+equipment depreciation
Powder material cost: The calculation method is generally based on square meters, and the price per kilogram of powder ranges from 25 to 60 yuan (mainly related to customer requirements). Generally, 4-5 square meters can be sprayed per kilogram of powder.
Powder material costa=6-15 yuan/square meter
Labor cost a: Sunt totum quinque homines in linea sprayionis, unusquisque persona 1200 iuan/mense cargatur, 22 dies in mense et 8 horas in die. Una hora 30 metros quadraticos sprayit.
Labor costa=15 * 1200/22/8/30=3.4 yuan/square meter
Costa materiae auxiliaria: prima refert ad prettrationem fluctum et fornacem currantem, quod est 50000 yuan per mensem. 22 dies per mensem, 8 horas per dies, 30 metros quadraticos per horam est.
Materiale auxiliari costa=9,47 yuan/square meter
Equipment depreciation: The spraying line has an investment of 1 million yuan and is depreciated for 5 years. It operates in December each year, 22 days a month, 8 hours a day, and sprays 30 square meters per hour.
Equipment depreciation costa est 100 * 10000/5/12/22/8/30=3.16 yuan/square meter
Total spraying cost=22-32 yuan/square meter
Si partial proteccio requirit, pretium maior erit.
4,Packaging fee
According to different products, packaging requirements and prices vary, usually ranging from 20 to 30 yuan/cubic meter.
5,
Costa transportation is in produktum amortificata est.
6,Management expenses
Duas partes ad administracionem expensas sunt: fabrica scissima, aqua et electrica, et expendita financa
Aqua et electrica fabrica rent:
Mensuae aqua rental et electrica pretium est 150000 yuan, et montana output valor 4 miliones yuan calculatur. proportio aquae rentabilis et electricae ad emissionem valor est 15/400=3.75%
Expendita financica:
Pro non-coincidentas receivabiles et pagabiles cyclibus (materia pecuniae emimus et clientes 60 dies per mensem), fundamenta minimo 3 mensibus in procento argentiae 1,25-1,5% tenemus.
Pro hoc expendita administracionis quasi 5% ex universo venditate pretio debet.
7, Profit
Considering the long-term development of the company and better customer service, set a reasonable profit point, such as 10% -15%.
The above 7 points are the main costs that constitute the product and are for reference only.
Methodus computationis quotationis ad stampionem
Preces fabricationis metallorum calculata est based on the operating time:
Laser cutting for 8RMB/Min, calculated at 1RMB per small hole
CNC precisa 5RMB/Min
CNC bending pricing is 1 RMB per later, double for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensis et robustum intellegentiam tendentium industriae requirunt, sed difficiles sunt operari.
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Procedentia frigida costa: 8.0-8.4RMB/KG, cum laboribus 50KG aut plus per opus producentes.
Opus frigidus includit sequentes: cuta machina rotae, vetera machina ferentea stila, vetera machina ferentea stila, flammae piercing, vetera ferentea, et pretia outsourcing ab 7.2 usque 7.5 RMB/KG.
Sub processionem coefficient is bases 1 est.
Outourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact:
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
Quando mensura plateae minus quam 1.2 est, costa processionis multiplicabitur a 2.5 a 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitus est quasi 28% usque 35%. Post deductionem taxarum, profitus est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75 quando pretium est.
Compositio cost is partium stampionis generale in sequentibus partes divisa est: 1 Materiale costa 2 Partes standard costi 3 Processis fermentum 4 Packaging fee 5 Transportation fee 6. Management fee 7 profitum
Let's take a closer look at the composition of these expenses below
Analysis of cost composition of stamping parts
1 , Material Costa
Material cost refers to the net material cost according to the drawing requirements=material volume * material density * material unit price.
CategoryName
Componente standard a drawinge desiderata est.
3,Process processing fee
Procedentia cost a pro singulis processionis in produktum necessa est. The composition of each process is detailed in the Cost Accounting Format and the Cost Composition Table for Each Process. Hic sunt principes exercitus componentibus explicationis:
1. CNC material dropping
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for a device worth 2 million yuan, the hourly equipment depreciation is 200 * 10000/5/12/22/8=189.4 yuan/hour
Labor costa:
Each CNC requires 3 technicians to operate, and the average monthly salary for each technician is 1800 yuan. They work 22 days in month and 8 hours a day, which means the hourly cost is 1800 * 3/22/8=31 yuan/hour
Materiale auxiliaria costa:
Refers to auxiliary production materials such as lubricants and volatile liquids required for equipment operation. Each equipment costs approximately 1000 yuan per month, calculated based on 22 days per month and 8 hours per day. The hourly cost is 1000/22/8=5.68 yuan/hour
2. Bending
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for equipment worth 500000 yuan, the depreciation per minute is 50 * 10000/5/12/22/8/60=0.79 yuan/minute
Usually takes 10 to 100 seconds to make a bend, so the depression of each bending equipment is 0.13-1.3 yuan per bend.
Labor costa:
Each device requires one technician to operate, with an average monthly salary of 1800 yuan. Each technician works 22 days in month and 8 hours in day, which means the cost per minute is 1800/22/8/60=0.17 yuan/minute. On average, 1-2 bends can be made per minute. Therefore, the labor cost per bend is 0.08-0.17 yuan/track
Materiale auxiliaria costa:
Costa materiarum auxiliarum per mensem pro singula machina bending est 600 yuan. Base sunt 22 dies per mensem et 8 horas per dies, costa horatis 600/22/8/60=0.06 yuan/track
3. Surface treatment
Outsourced based on purchase price (such as electroplating, oxidation)
Compositio emissionis:
Spray coating cost=powder material cost+labor cost+auxiliary material cost+equipment depreciation
Powder material cost: The calculation method is generally based on square meters, and the price per kilogram of powder ranges from 25 to 60 yuan (mainly related to customer requirements). Generally, 4-5 square meters can be sprayed per kilogram of powder.
Powder material costa=6-15 yuan/square meter
Labor cost a: Sunt totum quinque homines in linea sprayionis, unusquisque persona 1200 iuan/mense cargatur, 22 dies in mense et 8 horas in die. Una hora 30 metros quadraticos sprayit.
Labor costa=15 * 1200/22/8/30=3.4 yuan/square meter
Costa materiae auxiliaria: prima refert ad prettrationem fluctum et fornacem currantem, quod est 50000 yuan per mensem. 22 dies per mensem, 8 horas per dies, 30 metros quadraticos per horam est.
Materiale auxiliari costa=9,47 yuan/square meter
Equipment depreciation: The spraying line has an investment of 1 million yuan and is depreciated for 5 years. It operates in December each year, 22 days a month, 8 hours a day, and sprays 30 square meters per hour.
Equipment depreciation costa est 100 * 10000/5/12/22/8/30=3.16 yuan/square meter
Total spraying cost=22-32 yuan/square meter
Si partial proteccio requirit, pretium maior erit.
4,Packaging fee
According to different products, packaging requirements and prices vary, usually ranging from 20 to 30 yuan/cubic meter.
5,
Costa transportation is in produktum amortificata est.
6,Management expenses
Duas partes ad administracionem expensas sunt: fabrica scissima, aqua et electrica, et expendita financa
Aqua et electrica fabrica rent:
Mensuae aqua rental et electrica pretium est 150000 yuan, et montana output valor 4 miliones yuan calculatur. proportio aquae rentabilis et electricae ad emissionem valor est 15/400=3.75%
Expendita financica:
Pro non-coincidentas receivabiles et pagabiles cyclibus (materia pecuniae emimus et clientes 60 dies per mensem), fundamenta minimo 3 mensibus in procento argentiae 1,25-1,5% tenemus.
Pro hoc expendita administracionis quasi 5% ex universo venditate pretio debet.
7, Profit
Considering the long-term development of the company and better customer service, set a reasonable profit point, such as 10% -15%.
The above 7 points are the main costs that constitute the product and are for reference only.
Methodus computationis quotationis ad stampionem
Preces fabricationis metallorum calculata est based on the operating time:
Laser cutting for 8RMB/Min, calculated at 1RMB per small hole
CNC precisa 5RMB/Min
CNC bending pricing is 1 RMB per later, double for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensis et robustum intellegentiam tendentium industriae requirunt, sed difficiles sunt operari.
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Procedentia frigida costa: 8.0-8.4RMB/KG, cum laboribus 50KG aut plus per opus producentes.
Opus frigidus includit sequentes: cuta machina rotae, vetera machina ferentea stila, vetera machina ferentea stila, flammae piercing, vetera ferentea, et pretia outsourcing ab 7.2 usque 7.5 RMB/KG.
Sub processionem coefficient is bases 1 est.
Outourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact:
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
Quando mensura plateae minus quam 1.2 est, costa processionis multiplicabitur a 2.5 a 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitus est quasi 28% usque 35%. Post deductionem taxarum, profitus est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75 quando pretium est.
Compositio cost is partium stampionis generale in sequentibus partes divisa est: 1 Materiale costa 2 Partes standard costi 3 Processis fermentum 4 Packaging fee 5 Transportation fee 6. Management fee 7 profitum
Let's take a closer look at the composition of these expenses below
Analysis of cost composition of stamping parts
1 , Material Costa
Material cost refers to the net material cost according to the drawing requirements=material volume * material density * material unit price.
CategoryName
Componente standard a drawinge desiderata est.
3,Process processing fee
Procedentia cost a pro singulis processionis in produktum necessa est. The composition of each process is detailed in the Cost Accounting Format and the Cost Composition Table for Each Process. Hic sunt principes exercitus componentibus explicationis:
1. CNC material dropping
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for a device worth 2 million yuan, the hourly equipment depreciation is 200 * 10000/5/12/22/8=189.4 yuan/hour
Labor costa:
Each CNC requires 3 technicians to operate, and the average monthly salary for each technician is 1800 yuan. They work 22 days in month and 8 hours a day, which means the hourly cost is 1800 * 3/22/8=31 yuan/hour
Materiale auxiliaria costa:
Refers to auxiliary production materials such as lubricants and volatile liquids required for equipment operation. Each equipment costs approximately 1000 yuan per month, calculated based on 22 days per month and 8 hours per day. The hourly cost is 1000/22/8=5.68 yuan/hour
2. Bending
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for equipment worth 500000 yuan, the depreciation per minute is 50 * 10000/5/12/22/8/60=0.79 yuan/minute
Usually takes 10 to 100 seconds to make a bend, so the depression of each bending equipment is 0.13-1.3 yuan per bend.
Labor costa:
Each device requires one technician to operate, with an average monthly salary of 1800 yuan. Each technician works 22 days in month and 8 hours in day, which means the cost per minute is 1800/22/8/60=0.17 yuan/minute. On average, 1-2 bends can be made per minute. Therefore, the labor cost per bend is 0.08-0.17 yuan/track
Materiale auxiliaria costa:
Costa materiarum auxiliarum per mensem pro singula machina bending est 600 yuan. Base sunt 22 dies per mensem et 8 horas per dies, costa horatis 600/22/8/60=0.06 yuan/track
3. Surface treatment
Outsourced based on purchase price (such as electroplating, oxidation)
Compositio emissionis:
Spray coating cost=powder material cost+labor cost+auxiliary material cost+equipment depreciation
Powder material cost: The calculation method is generally based on square meters, and the price per kilogram of powder ranges from 25 to 60 yuan (mainly related to customer requirements). Generally, 4-5 square meters can be sprayed per kilogram of powder.
Powder material costa=6-15 yuan/square meter
Labor cost a: Sunt totum quinque homines in linea sprayionis, unusquisque persona 1200 iuan/mense cargatur, 22 dies in mense et 8 horas in die. Una hora 30 metros quadraticos sprayit.
Labor costa=15 * 1200/22/8/30=3.4 yuan/square meter
Costa materiae auxiliaria: prima refert ad prettrationem fluctum et fornacem currantem, quod est 50000 yuan per mensem. 22 dies per mensem, 8 horas per dies, 30 metros quadraticos per horam est.
Materiale auxiliari costa=9,47 yuan/square meter
Equipment depreciation: The spraying line has an investment of 1 million yuan and is depreciated for 5 years. It operates in December each year, 22 days a month, 8 hours a day, and sprays 30 square meters per hour.
Equipment depreciation costa est 100 * 10000/5/12/22/8/30=3.16 yuan/square meter
Total spraying cost=22-32 yuan/square meter
Si partial proteccio requirit, pretium maior erit.
4,Packaging fee
According to different products, packaging requirements and prices vary, usually ranging from 20 to 30 yuan/cubic meter.
5,
Costa transportation is in produktum amortificata est.
6,Management expenses
Duas partes ad administracionem expensas sunt: fabrica scissima, aqua et electrica, et expendita financa
Aqua et electrica fabrica rent:
Mensuae aqua rental et electrica pretium est 150000 yuan, et montana output valor 4 miliones yuan calculatur. proportio aquae rentabilis et electricae ad emissionem valor est 15/400=3.75%
Expendita financica:
Pro non-coincidentas receivabiles et pagabiles cyclibus (materia pecuniae emimus et clientes 60 dies per mensem), fundamenta minimo 3 mensibus in procento argentiae 1,25-1,5% tenemus.
Pro hoc expendita administracionis quasi 5% ex universo venditate pretio debet.
7, Profit
Considering the long-term development of the company and better customer service, set a reasonable profit point, such as 10% -15%.
The above 7 points are the main costs that constitute the product and are for reference only.
Methodus computationis quotationis ad stampionem
Preces fabricationis metallorum calculata est based on the operating time:
Laser cutting for 8RMB/Min, calculated at 1RMB per small hole
CNC precisa 5RMB/Min
CNC bending pricing is 1 RMB per later, double for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensis et robustum intellegentiam tendentium industriae requirunt, sed difficiles sunt operari.
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Procedentia frigida costa: 8.0-8.4RMB/KG, cum laboribus 50KG aut plus per opus producentes.
Opus frigidus includit sequentes: cuta machina rotae, vetera machina ferentea stila, vetera machina ferentea stila, flammae piercing, vetera ferentea, et pretia outsourcing ab 7.2 usque 7.5 RMB/KG.
Sub processionem coefficient is bases 1 est.
Outourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact:
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
Quando mensura plateae minus quam 1.2 est, costa processionis multiplicabitur a 2.5 a 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitus est quasi 28% usque 35%. Post deductionem taxarum, profitus est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75 quando pretium est.
Compositio cost is partium stampionis generale in sequentibus partes divisa est: 1 Materiale costa 2 Partes standard costi 3 Processis fermentum 4 Packaging fee 5 Transportation fee 6. Management fee 7 profitum
Let's take a closer look at the composition of these expenses below
Analysis of cost composition of stamping parts
1 , Material Costa
Material cost refers to the net material cost according to the drawing requirements=material volume * material density * material unit price.
CategoryName
Componente standard a drawinge desiderata est.
3,Process processing fee
Procedentia cost a pro singulis processionis in produktum necessa est. The composition of each process is detailed in the Cost Accounting Format and the Cost Composition Table for Each Process. Hic sunt principes exercitus componentibus explicationis:
1. CNC material dropping
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for a device worth 2 million yuan, the hourly equipment depreciation is 200 * 10000/5/12/22/8=189.4 yuan/hour
Labor costa:
Each CNC requires 3 technicians to operate, and the average monthly salary for each technician is 1800 yuan. They work 22 days in month and 8 hours a day, which means the hourly cost is 1800 * 3/22/8=31 yuan/hour
Materiale auxiliaria costa:
Refers to auxiliary production materials such as lubricants and volatile liquids required for equipment operation. Each equipment costs approximately 1000 yuan per month, calculated based on 22 days per month and 8 hours per day. The hourly cost is 1000/22/8=5.68 yuan/hour
2. Bending
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for equipment worth 500000 yuan, the depreciation per minute is 50 * 10000/5/12/22/8/60=0.79 yuan/minute
Usually takes 10 to 100 seconds to make a bend, so the depression of each bending equipment is 0.13-1.3 yuan per bend.
Labor costa:
Each device requires one technician to operate, with an average monthly salary of 1800 yuan. Each technician works 22 days in month and 8 hours in day, which means the cost per minute is 1800/22/8/60=0.17 yuan/minute. On average, 1-2 bends can be made per minute. Therefore, the labor cost per bend is 0.08-0.17 yuan/track
Materiale auxiliaria costa:
Costa materiarum auxiliarum per mensem pro singula machina bending est 600 yuan. Base sunt 22 dies per mensem et 8 horas per dies, costa horatis 600/22/8/60=0.06 yuan/track
3. Surface treatment
Outsourced based on purchase price (such as electroplating, oxidation)
Compositio emissionis:
Spray coating cost=powder material cost+labor cost+auxiliary material cost+equipment depreciation
Powder material cost: The calculation method is generally based on square meters, and the price per kilogram of powder ranges from 25 to 60 yuan (mainly related to customer requirements). Generally, 4-5 square meters can be sprayed per kilogram of powder.
Powder material costa=6-15 yuan/square meter
Labor cost a: Sunt totum quinque homines in linea sprayionis, unusquisque persona 1200 iuan/mense cargatur, 22 dies in mense et 8 horas in die. Una hora 30 metros quadraticos sprayit.
Labor costa=15 * 1200/22/8/30=3.4 yuan/square meter
Costa materiae auxiliaria: prima refert ad prettrationem fluctum et fornacem currantem, quod est 50000 yuan per mensem. 22 dies per mensem, 8 horas per dies, 30 metros quadraticos per horam est.
Materiale auxiliari costa=9,47 yuan/square meter
Equipment depreciation: The spraying line has an investment of 1 million yuan and is depreciated for 5 years. It operates in December each year, 22 days a month, 8 hours a day, and sprays 30 square meters per hour.
Equipment depreciation costa est 100 * 10000/5/12/22/8/30=3.16 yuan/square meter
Total spraying cost=22-32 yuan/square meter
Si partial proteccio requirit, pretium maior erit.
4,Packaging fee
According to different products, packaging requirements and prices vary, usually ranging from 20 to 30 yuan/cubic meter.
5,
Costa transportation is in produktum amortificata est.
6,Management expenses
Duas partes ad administracionem expensas sunt: fabrica scissima, aqua et electrica, et expendita financa
Aqua et electrica fabrica rent:
Mensuae aqua rental et electrica pretium est 150000 yuan, et montana output valor 4 miliones yuan calculatur. proportio aquae rentabilis et electricae ad emissionem valor est 15/400=3.75%
Expendita financica:
Pro non-coincidentas receivabiles et pagabiles cyclibus (materia pecuniae emimus et clientes 60 dies per mensem), fundamenta minimo 3 mensibus in procento argentiae 1,25-1,5% tenemus.
Pro hoc expendita administracionis quasi 5% ex universo venditate pretio debet.
7, Profit
Considering the long-term development of the company and better customer service, set a reasonable profit point, such as 10% -15%.
The above 7 points are the main costs that constitute the product and are for reference only.
Methodus computationis quotationis ad stampionem
Preces fabricationis metallorum calculata est based on the operating time:
Laser cutting for 8RMB/Min, calculated at 1RMB per small hole
CNC precisa 5RMB/Min
CNC bending pricing is 1 RMB per later, double for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensis et robustum intellegentiam tendentium industriae requirunt, sed difficiles sunt operari.
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Procedentia frigida costa: 8.0-8.4RMB/KG, cum laboribus 50KG aut plus per opus producentes.
Opus frigidus includit sequentes: cuta machina rotae, vetera machina ferentea stila, vetera machina ferentea stila, flammae piercing, vetera ferentea, et pretia outsourcing ab 7.2 usque 7.5 RMB/KG.
Sub processionem coefficient is bases 1 est.
Outourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact:
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
Quando mensura plateae minus quam 1.2 est, costa processionis multiplicabitur a 2.5 a 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitus est quasi 28% usque 35%. Post deductionem taxarum, profitus est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75 quando pretium est.
Compositio cost is partium stampionis generale in sequentibus partes divisa est: 1 Materiale costa 2 Partes standard costi 3 Processis fermentum 4 Packaging fee 5 Transportation fee 6. Management fee 7 profitum
Let's take a closer look at the composition of these expenses below
Analysis of cost composition of stamping parts
1 , Material Costa
Material cost refers to the net material cost according to the drawing requirements=material volume * material density * material unit price.
CategoryName
Componente standard a drawinge desiderata est.
3,Process processing fee
Procedentia cost a pro singulis processionis in produktum necessa est. The composition of each process is detailed in the Cost Accounting Format and the Cost Composition Table for Each Process. Hic sunt principes exercitus componentibus explicationis:
1. CNC material dropping
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for a device worth 2 million yuan, the hourly equipment depreciation is 200 * 10000/5/12/22/8=189.4 yuan/hour
Labor costa:
Each CNC requires 3 technicians to operate, and the average monthly salary for each technician is 1800 yuan. They work 22 days in month and 8 hours a day, which means the hourly cost is 1800 * 3/22/8=31 yuan/hour
Materiale auxiliaria costa:
Refers to auxiliary production materials such as lubricants and volatile liquids required for equipment operation. Each equipment costs approximately 1000 yuan per month, calculated based on 22 days per month and 8 hours per day. The hourly cost is 1000/22/8=5.68 yuan/hour
2. Bending
Its cost composition=equipment depreciation and amortization+labor cost+auxiliary materials
Equipment depreciation and amortisation:
Equipment a depreciatio 5 annorum cogitata est, 12 mensibus anni, 22 dies in mense, 8 horas in die.
For example, for equipment worth 500000 yuan, the depreciation per minute is 50 * 10000/5/12/22/8/60=0.79 yuan/minute
Usually takes 10 to 100 seconds to make a bend, so the depression of each bending equipment is 0.13-1.3 yuan per bend.
Labor costa:
Each device requires one technician to operate, with an average monthly salary of 1800 yuan. Each technician works 22 days in month and 8 hours in day, which means the cost per minute is 1800/22/8/60=0.17 yuan/minute. On average, 1-2 bends can be made per minute. Therefore, the labor cost per bend is 0.08-0.17 yuan/track
Materiale auxiliaria costa:
Costa materiarum auxiliarum per mensem pro singula machina bending est 600 yuan. Base sunt 22 dies per mensem et 8 horas per dies, costa horatis 600/22/8/60=0.06 yuan/track
3. Surface treatment
Outsourced based on purchase price (such as electroplating, oxidation)
Compositio emissionis:
Spray coating cost=powder material cost+labor cost+auxiliary material cost+equipment depreciation
Powder material cost: The calculation method is generally based on square meters, and the price per kilogram of powder ranges from 25 to 60 yuan (mainly related to customer requirements). Generally, 4-5 square meters can be sprayed per kilogram of powder.
Powder material costa=6-15 yuan/square meter
Labor cost a: Sunt totum quinque homines in linea sprayionis, unusquisque persona 1200 iuan/mense cargatur, 22 dies in mense et 8 horas in die. Una hora 30 metros quadraticos sprayit.
Labor costa=15 * 1200/22/8/30=3.4 yuan/square meter
Costa materiae auxiliaria: prima refert ad prettrationem fluctum et fornacem currantem, quod est 50000 yuan per mensem. 22 dies per mensem, 8 horas per dies, 30 metros quadraticos per horam est.
Materiale auxiliari costa=9,47 yuan/square meter
Equipment depreciation: The spraying line has an investment of 1 million yuan and is depreciated for 5 years. It operates in December each year, 22 days a month, 8 hours a day, and sprays 30 square meters per hour.
Equipment depreciation costa est 100 * 10000/5/12/22/8/30=3.16 yuan/square meter
Total spraying cost=22-32 yuan/square meter
Si partial proteccio requirit, pretium maior erit.
4,Packaging fee
According to different products, packaging requirements and prices vary, usually ranging from 20 to 30 yuan/cubic meter.
5,
Costa transportation is in produktum amortificata est.
6,Management expenses
Duas partes ad administracionem expensas sunt: fabrica scissima, aqua et electrica, et expendita financa
Aqua et electrica fabrica rent:
Mensuae aqua rental et electrica pretium est 150000 yuan, et montana output valor 4 miliones yuan calculatur. proportio aquae rentabilis et electricae ad emissionem valor est 15/400=3.75%
Expendita financica:
Pro non-coincidentas receivabiles et pagabiles cyclibus (materia pecuniae emimus et clientes 60 dies per mensem), fundamenta minimo 3 mensibus in procento argentiae 1,25-1,5% tenemus.
Pro hoc expendita administracionis quasi 5% ex universo venditate pretio debet.
7, Profit
Considering the long-term development of the company and better customer service, set a reasonable profit point, such as 10% -15%.
The above 7 points are the main costs that constitute the product and are for reference only.
Methodus computationis quotationis ad stampionem
Preces fabricationis metallorum calculata est based on the operating time:
Laser cutting for 8RMB/Min, calculated at 1RMB per small hole
CNC precisa 5RMB/Min
CNC bending pricing is 1 RMB per later, double for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensis et robustum intellegentiam tendentium industriae requirunt, sed difficiles sunt operari.
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Procedentia frigida costa: 8.0-8.4RMB/KG, cum laboribus 50KG aut plus per opus producentes.
Opus frigidus includit sequentes: cuta machina rotae, vetera machina ferentea stila, vetera machina ferentea stila, flammae piercing, vetera ferentea, et pretia outsourcing ab 7.2 usque 7.5 RMB/KG.
Sub processionem coefficient is bases 1 est.
Outourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact:
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
Quando mensura plateae minus quam 1.2 est, costa processionis multiplicabitur a 2.5 a 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitus est quasi 28% usque 35%. Post deductionem taxarum, profitus est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75 quando pretium est.