During the delivery of CNC walking machines, the following points should be noted:
Ego Handover of CNC walking machines to customer factories:
1. Disassemble the outer packaging of the machine tool and check if there is any damage during transportation.
2. Calculate random parts with the customer, confirm if the parts are complete, request the customer to sign and stamp and leave a list.
3. Disassemble the locking blocks of each axis of the walking machine to avoid damage during startup.
Duo. Preparation for machine tools installation:
1. Prepare a three-phase 380V power supply and ground wire and introduce a 2.5mm square wire in the machine tool to be installed.
2. Prepare the necessary 0.5mpa pressure to ensure normal operation of the machine, and connect the Φ 8 air pipe to the machine tool. Si gasum pro pastore necessum est, coniuncta F8 gasolinibus emere oportet.
3. Prepare lubricating oil suitable for CNC centrifuges (such as GATA32).
4. According to the product processing technology, select tools and chucks that meet the drawings (excluding standards).
5. Prepare sufficient e cutting oil and select the quality and type of cutting oil according to the different materials of precision parts processed by the machine tool (e.g. cutting oil FS12A).
Tres. Precisiones installationis instrumentorum machinarum et debugationis:
1. Connect the gas source and power supply, use a multimeter to measure and confirm that the input voltage is 380V.
2. Apendite potentiam, inite CNC lathe, et videte si unus constituens unum per singulos exercere potest.
3. Adjust the angle of the machine tool to ensure that it is placed smoothly.
4. Collaborate with feeder manufacturers to install feeding equipment.
5. Test whether all actions of the machine tool and feed equipment are well coordinated.
6. Patiently explain other operational matters that the customer needs to pay attention to.