Precs fabricationis metallis calculatur in tempore operationis
Laser cutting for 8RMB/M, calculated at 1RMB per small hole
CNC pricing of 5RMB/Min
CNC bending pricing: 1 RMB per side, double the price for the larger side
Calculatio laboris frigidis fermentis septuaginta RMB per diem, cum 50KG per diem opus quam benchmarkus est
Metodos calculationis supra altum nivellum qualitatis comprehensivae et robustum intellegentiam tendentium industriae, quod significat difficiles operari sunt
The following sheet metal calculations are empirical formulas that do not consider manufacturing processes:
Materiyal preci=materyal peso değeri x pazarı eşyaları düşürdü.
Procedentes calculationes mercedes: absque considering process, tax, management fees, and shipping costs
Calculatio tabulatorum: 3200RMB/T platea calidantis fertilis t=2.0 1804-m gradus 7 IT7
Cold work processing cost: 8.0-8.4RMB/KG, with workers producing 50KG or more per work,
Cold work includes the following: grinding wheel machine cutting, old style shearing machines, old style bending machines, flame piercing, old welding, and outsourcing prices ranging from 7.2 to 7.5 RMB/KG.
The above processing coefficient base is set to 1.
The outsourcing costs for CNC cutting, CNC punching, CNC bending, and CO2 shielded welding are calculated with a coefficient of 2.5-3.5, and the coefficients are taken into account based on the number of processes and complexity.
Laser cutting is twice the impact;
Quando tabula non est aequala a 2, costa processionis aequala a 2 computatur
When the plate size is less than 1.2, the processing cost is multiplied by 2.5 to 3.5
Quando mercatus materiae fluctus est, fundus processionis inmutatus est.
Si fabricatio metalla folia absque fermento congregata est, coefficientem numerationis multiplicatur a 0,75 usque 0,85, saepe maximum valorem accipit.
Quando nivel tolerantiae usque ad 1804-f augetur, coefficiens numerationis multiplicatur a 1.5-2;
For batch deburring and blunting, multiplicate the counting coefficient by 1.1 to 1.5;
Preces superficie est RMB/m2 20-30.
Prius superficie tres graduum processationis picturae est 15-20RMB/m2;
qui enim habent opus et difficiles in fabricatione et processione necesse est considerare fructum et multiplicare coefficientem fructus
Preces supra est pretium standard, quod signum est quod si merces inter 3%, profitum est quasi 28% usque 35%. Post deductionem taxarum, profitum est circa 18% usque 23%. Si est requisum pro profito, correspondentia multiplication is non minus quam 1,75, quando pretium est.