Data collection before Sheet Metal Processing in Shenyang
After receiving the planning task, the chassis structure planner should have a detailed understanding of the various technical indicators proposed in the equipment protocol. Because it is the basis for planning, manufacturing, inspection, and application. It includes requirements for equipment usage, operating conditions, external dimensions, weight, structural type, decoration, surface coating and twisting, as well as related production processes, transportation and packaging, storage, and other aspects.
2. Chassis structure planners should Work closely with electrical supervisors and planners. The following situations should be understood
1) How many unit circuits or functional circuits do the general electrical schematic diagram consist of.
2) How many unit structure boxes are these unit circuits placed in.
3) How many types of power sources does the device use. Distributed power supply or centralized power supply.
4) Provide a detailed list of equipment components to facilitate the external dimensions of electrical components.
The content of the article is sourced from the internet. If you have any questions, please contact me to delete it!